Aanesland Treindustri’s new flagship building in Lillesand covers 1,900 m² and was completed in 2022. The building was designed by the architects at Helen & Hard. The structural elements for the new building at Gaupemyr were supplied from Aanesland’s own glulam factory in Marnardal, Sørlaminering, which Aanesland Fabrikker AS acquired in 2019. The factory was constructed entirely without a single nail.
Aanesland Treindustri
Culture and industry
Architect: Helen & Hard
Year: 2021
Location: Lillesand